Halton Hills Sewage Pumping Station

hhsps_04
hhsps_04
hhsps_01
hhsps_01
hhsps_02
hhsps_02
hhsps_03
hhsps_03

Project Details

Value: $2,089,273
Start Date: May 2012
Completion Date: April 2013
Total Floor Area: 1,800 sq. ft.

BECC is proud to have been the General Contractor on the Halton Hills Sewage Pumping Station #3. This project involves the construction of a new 53L/s submersible sewage pumping station consisted of: dual cell 5.2m x 5.2m wet well complete with 2 constant speed submersible pumps and all associated piping within the site boundary. Separate single story control building containing an electrical room and metering room on the main floor and a below grade piping gal-lery. Installation of electrical, controls instrumentation etc. Supply and install a standalone standby diesel gen-erator outside the control building. Installation of as-sociated heating, ventilation, air handling, and other mechanical equipment. The new control room exterior consists of masonry block veneer, asphalt shingle roofing, prefabricated wood trusses and structural steel. Exterior works comprises of asphalt paving, landscaping and site servicing. The project also involved the open cut of 11 meters down.